Remedial Investigation /
Feasibility Study Summary
A systematic deployment focused on isolating high-concentration subsurface liabilities and optimizing long-term capital allocation.
Project Scale
8.0 Acres
Data Resolution
82 Borings
Community Impact
3.5 Miles
Strategic Value Proposition
The current Work Plan represents a critical lifecycle pivot for the American Thermostat asset. Site management is transitioning from passive containment to active source isolation.
Institutional Logic: RI/FS
The Remedial Investigation (RI) phase serves as technical due diligence to quantify subsurface liability. The Feasibility Study (FS) acts as the optimization model to select the most capital-efficient exit strategy.
Operational Scope
Deep-Horizon DNAPL Isolation
Targeted drilling and vertical profiling focus on locating DNAPL. Advanced hydrogeological modeling is deployed to delineate high-density contamination zones.
Waterline Infrastructure Integration
Deployment of a 3.5-mile municipal waterline extension removes the exposure pathway for residential receptors, providing a permanent risk-transfer solution.
Timeline
Q2 2024
Work Plan Approval
2024 — 2025
RI Data Acquisition
Technical Authority
Engineer
Tetra Tech, Inc.
Oversight
US EPA Region 2 & USACE
Capital Reference
Funded via the Bipartisan Infrastructure Law (BIL).
Task Order
W912DQ24F3006